Building Permit Drawings in Pickering
Two Pickerings, two kinds of work: suites and additions in the established south, basement finishing and conversions in the brand-new north.
The South Is Established. The North Is Brand New.
Pickering is mid-transformation. South of Highway 407, its established neighbourhoods date to the postwar decades through the 1990s — mature streets where the work is suites, additions and renovations. In the north, the Seaton lands are adding one of the GTA's largest new communities, with houses whose basements haven't seen a wall stud yet. The two halves need different drawings, and we produce both, prepared for the City of Pickering's review.
The established stock converts and extends well. We design basement second suites — new or legalized — and rear and second-storey additions, each starting from measured drawings of the existing house.
Second Suite Conversions
Legal self-contained units
Legalization Drawings
Existing units brought to compliance
Additions
Rear and second-storey extensions
Seaton's new homes arrive with big unfinished basements — the easiest possible starting point for a legal suite or quality finished space. We design from the blank slate and deliver the complete permit set.
New-Build Suites
Conversions designed right from day one
Basement Finishing
Permitted, inspected finished space
Decks & Porches
The new home's first outdoor structures
Pickering Building Permit Questions
Building in Pickering?
Suite, addition or a brand-new basement — start with a free consultation and a clear quote for the drawings.
GET YOUR FREE CONSULTATION